Contact us

Air handling for Infineon manufacturing plant

For the new Infineon plant, we supplied hygienic and precise air ducts. The project required high quality , which we ensured thanks to modern technology,
Contact us

About the project and results

Efficiency of implementation:
Completed in 45 days
Air quality:
100 % hygienic solution
Energy saving:
Savings up to 30 %
Precise climate control:
3 independent zones
Reliable operation
Failure rate down by 50 %

Heading 2

Heading 3

Heading 4

Heading 5

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Fusce pharetra massa eu orci ultrices, id ultricies mi aliquam. Etiam lacus elit, scelerisque at blandit egestas, dignissim eget turpis. Morbi sagittis pellentesque sapien, ut vestibulum nisl pulvinar eu. Integer ultricies eros eget sapien dapibus, a scelerisque lectus consectetur. Aenean eu molestie mauris. Fusce a efficitur urna. Sed vitae tortor nisl. Donec interdum rutrum semper. Aenean non mi ac nulla semper pulvinar vel nec eros. Praesent fermentum libero urna, sed dapibus purus laoreet id.

  1. Bold text - The first case study
  2. Link - The first case study
  3. Еmphasis - The first case study
  4. Text - The first case study

Lorem ipsum dolor sit amet consectetur. Velit eu ullamcorper eget maecenas imperdiet cras. Mattis massa a diam maecenas. Ut tellus enim turpis posuere ultrices tortor ac malesuada. Mattis enim facilisi .Velit eu ullamcorper eget maecenas

- Dr. Martin Šebek

Project in detail

Contact us

Discover more projects

All projects
© 2026. TZB Global. All rights reserved.
Created in
crossmenuchevron-down